San Diego International Airport New Terminal 1
San Diego, California
Full design services for acoustic, noise, and vibration for the 1,210,000 GSF, 30 gate, 3-level, $3.4B replacement of the 60s-era Terminal 1.
Seattle Children’s Research Institute Building Cure
Seattle, Washington
Interior acoustical and vibration design, sound insulation between sensitive spaces, and noise and vibration control of MEP systems.