San Diego, California Full design services for acoustic, noise, and vibration for the 1,210,000 GSF, 30 gate, 3-level, $3.4B replacement of the 60s-era Terminal 1.
California High Speed Rail EIR/EIS: SF-San Jose + San Jose-Merced
San Francisco-Merced, California Certified EIR/EIS: Conducted detailed noise and vibration analyses and impact assessments for two of the project sections.
UCSF Neuroscience Center
San Francisco, California Noise and vibration services for 5-story, LEED Gold research facility. Base building structural evaluation of floor for transient vibration due to internal/external sources.
Hawthorne Folsom Place
San Francisco, California Mechanical equipment noise and vibration control for redevelopment of existing office buildings. Predicted structure borne noise from rooftop equipment using FEA.
UCSF Clinical and Translational Science Institute
San Francisco, California Evaluated floor and ground vibration related to highway, street traffic and nearby trains. Predicted floor vibration levels inside the building by employing FEA.